
Engineered for structural stability and full CIDB compliance. We provide PE-Endorsed drawings, in-house installation, and rapid site mobilization for Malaysia’s most demanding projects.
Engineered for structural stability and full CIDB compliance. We provide PE-Endorsed drawings, in-house installation, and rapid site mobilization for Malaysia’s most demanding projects.
Authority-compliant perimeter solutions engineered for fast approvals, safe execution, and zero site disruption.
Direct control from planning to installation. Consistent quality, safer execution, zero dependency on third parties.
Pre-prepared documentation aligned with authority requirements to accelerate submission and reduce back-and-forth delays.
We deploy based on your project pace - ensuring hoarding is up before delays become costly.
Proven experience in high-traffic sites where safety, presentation, and control matter most.
Aligned with CIDB, JKR, and local authority requirements. Engineered to pass - not revised later.
Top-tier contractors choose HG metal deck hoarding for its proven safety compliance, fast in-house execution, and reliable quality that consistently meets demanding site standards.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
We provide Professional Engineer (PE) Endorsed Drawings for all our metal deck hoarding systems. Our documentation is designed to integrate directly into your local authority submission.
Certified technical drawings tailored to your specific hoarding configuration.
Validated wind-load analysis and foundation fixity reports.
Professional endorsements required by the Main Contractor for site permit applications.
All drawings and calculations are prepared in accordance with relevant Malaysian standards and guidelines.
Every drawing is prepared to meet authority requirements and ensure your project moves forward without delay.
Every HG installation is a method-driven system engineered to meet Local Authority Requirements. We customize each configuration based on site-specific conditions, ensuring full compliance with safety standards and approval mandates for a seamless, on-time deployment.
4 Steps Installation Process:
Evaluate ground condition, authority requirement, and deployment duration.
Concrete footing / anchor bolt setting with precise alignment.
Full structural frame assembly with stability control.
Deck panel fixing, slanted roof (if required), and final inspection.
Get in touch with our team to discuss your metal deck hoarding requirements for your project.
WhatsApp us